The Burbank Channel Bikeway is a one-mile off-street bicycle and pedestrian path located in Burbank, CA. It runs alongside the Burbank Western Flood Control Channel, a tributary of the Los Angeles River. Phase I of the project was completed in 2011, and Phase II, which extended the path from the Downtown Metrolink Station to Alameda Avenue, was finished in 2021.
The project was primarily funded through capital grant funds provided by the Los Angeles County Metropolitan Transportation Authority (LA Metro). The City of Burbank sought local input on the design of the bikeway through a community survey, and the results were presented at a community meeting in 2014. The Burbank Channel Bikeway offers a safe and convenient route for cyclists and pedestrians to enjoy outdoor activities in the area.
Generated from the website